24-hour TSP Monitoring Results                          
Station AM5                                  
Start Finish Weather Filter Weight (g) Elapsed Time Reading Sampling Time Flow Rate (m3/min) TSP Conc. Action Level Limit Level Observations / Remarks Sampler Filter
Date Time Date Time   Initial Final Initial Final (hrs) Initial Final Average  (µg/m3)  (µg/m3)  (µg/m3)   ID ID
06-Oct-10 16:13 07-Oct-10 16:13 Fine 2.8305 3.0127 1301.81 1325.81 24.00 1.34 1.34 1.34 94 188.5 260 No major construction works 2146 325
12-Oct-10 11:34 13-Oct-10 11:34 Fine 2.8394 2.9854 1328.81 1352.81 24.00 1.36 1.36 1.36 74 188.5 260 No major construction works 2146 329
18-Oct-10 11:22 19-Oct-10 11:22 Fine 2.8026 2.9095 1355.81 1379.81 24.00 1.34 1.34 1.34 56 188.5 260 Operation of hydraulic extractor 2146 339
22-Oct-10 15:00 23-Oct-10 15:00 Fine 2.8227 3.1036 1382.81 1406.81 24.00 1.40 1.40 1.40 140 188.5 260 Operation of mobile crane 2146 346
28-Oct-10 15:20 29-Oct-10 15:20 Fine 2.8171 3.0750 1409.81 1433.81 24.00 1.39 1.39 1.39 129 188.5 260 Operation of mobile crane 2146 353
                        Min. 56          
                        Max. 140          
                        Average 99